一级特黄女**毛片,国产一区在线观看视频,欧美影院在线,日韩综合区,国产三级久久,国内国语一级毛片在线视频,欧美一级色视频

Hotline: 13511543292     中文版 English
NAVIGATION
CONTACT US
Mobile phone: 13511543292
Fax: 19961839099
Website: m.spjxhg.com
Address: 29 weiliu road, huaiyin district, huaian city, jiangsu province, China
Zip code: 223300
Huaian HuaHe Hydraulic Machinery Co.,LTD.
The design process of power unit is introduced
Add time: 2019/9/17 15:21:15   Click: 854
The design of power unit is an important link that cannot be ignored. Do you know the specific design process? What factors should we pay attention to? First, we need to complete the hydraulic and power system calculation, and to determine the engine model and specifications. Then, according to the calculation results of the hydraulic system and referring to the existing engine products in the product library of various engine manufacturers, select the engine products that meet the demand of power unit size, especially the demand of height.
 
The following is to consider the actual situation, reasonable design of the power unit installation rack and the layout of each component. Generally, according to the structural characteristics of the mounting frame and the engine, the installation of the engine adopts the suspension type, the engine is supported at three points, one of which is supported at the fan end, the other two points are supported by two legs of the transmission box, and the transmission box is connected with the engine flywheel shell. The hydraulic oil pump is connected to the engine flywheel through the coupling of the transfer case for the engine power output.
 
After finishing the layout of each part, it is necessary to make appropriate adjustments and optimize the structural strength of the mounting rack. Such as through each component in the power unit in the mounting bracket arrangement in 3 d modeling, to have a mutual interference between the parts, influence use, not easy to maintain parts position adjustment, especially for the engine cooling system through the adjustment and test of each component can play to their respective functions in the mounting bracket.
 
Normally, after the components are fixed, and then combined with the force of the whole and the parts of force and the vibration of the power unit, the finite element analysis was carried out on the mounting bracket, for some of the stress concentration location is optimized and reinforcement, thus ensuring the intensity of the use of the power unit.
【Return to the previous page】
CONTACT US
Mobile phone: 13511543292
Fax: 19961839099
Website: m.spjxhg.com

Address: 29 weiliu road, huaiyin district, huaian city, jiangsu province, China
Zip code: 223300
Key words: power unit、hydraulic power unit、huaian power unithuaian hydraulic power unit
All rights reserved: Huaian HuaHe Hydraulic Machinery Co.,LTD.   Website registration no: ICP 16039044-2
肇庆市| 那曲县| 丹寨县| 林甸县| 无为县| 仁怀市| 乌拉特中旗| 怀安县| 徐汇区| 嵊泗县| 洛浦县| 吴堡县| 内黄县| 金溪县| 曲沃县| 江阴市| 健康| 海盐县| 股票| 合江县| 二手房| 托里县| 林甸县| 武山县| 鲁山县| 彭水| 昔阳县| 建德市| 襄城县| 江口县| 金山区| 同江市| 个旧市| 固阳县| 正蓝旗| 桐梓县| 江西省| 台南市| 水城县| 黄陵县| 丹东市|